Monday, May 12, 2008
Yay!! Linen cupboard installed!!
Finally - I have a linen cupboard - you can see my mirror cabinet too. So nearly there.... I have also put down my deposit for my kitchen today - about an 11 week wait - so about late July I should be cooking with gas!
.
.......
.
Saturday, May 3, 2008
Bathroom nearly finished.... I can shower again!!!
I now have a 80% completed bathroom that is starting to look great!! Still no linen cupboard, shower screen door, mirror cabinet or paint - BUT I have running water and a power point!!! Exciting stuff. No more showers at work or the gym!!! Yay!!!
Saturday, April 19, 2008
Friday, April 11, 2008
Lucy's cat door blocked off!!!
Before
My bathroom has been started today.... Lucy, my cat used to be able to get in and out of the house through a space between the wall and floor... Not anymore!!! Today, the toilet and basin have been removed and the new corner shower cavity has had the first layer of waterproofing. They were kind enough not to remove the old shower, so I would have something over the weekend. They have also installed a new cavity sliding door, as the old door really intruded on the space (The bathroom is about 2.2m x 2.3m)
In the coming week or so, my bathroom will have...
- new floor, ceiling and wall lining
- new back to wall toilet - position is being moved to where old shower is
- new louvre windows to replace existing casement windos
- tiles to floors and walls to window height
- new taps and rail shower
- wall hung vanity basin with mirror wall cabinet
- linen cupboard
- downlighting
- extractor fan
Sunday, June 10, 2007
Lounge room nearly painted!!
I have also bought all my bathroom supplies at Reece during their May sale - will delivered at the end of June.