Tuesday, May 18, 2010

Don't fence me in!

It's been ages since anything exciting has happened to my little house. Now the rush is on to get it to a rentable state by August as I am going to work in Antarctica for 6 months. No pressure - just have to get the house fully painted, floors sanded, a bit of electrical work and what to do with the back undercover disaster area!

Newly mulched garden bed down the side of the house

However progress on been made in the front yard - as of today I have a new front picket fence. I also have new exposed aggregate concrete paths. I am going to talk to my gardening about turning the dirt area into a mulched garden bed. It should look so much neater and give my house much better street appeal. New front stairs have also been made up and I am getting horizontal timber slats under the house between the concrete stumps so block the sight of more dirt. The plumber also came today so now my down pipes all drain properly into a new PVC pipe running to the street drain. No more open concrete drain down the side of my house - check of the photo of how rusted my drain pipe was!




The old stairs and concrete slab

Sunday, September 14, 2008

New kitchen cabinets

Firstly the outside weatherboards needed replacing, then old windows replaced by louvres. All walls and ceilings were lined with new plasterboard. My floors were polished the week previously - the lounge, kitchen and third bedroom.

Two days ago my new kitchen cabinets went in after 6 weeks without a kitchen at all..... Unfortunately the electrician had not been so still no lights, fan, stove etc - only one lonely power point.

The pantry, fridge space, broom cupboard and washing machine space.


Laundry basin, dishwasher etc.



The free standing stove and oven, and rangehood yet to be installed.



Exit to the lounge room.



The front loading washing machine and dryer space.



Hopefully (cross my fingers) that all the electrical work and stove will be installed tomorrow. Then I have to decide on what splashback to go for - tile / stainless steel / glass....

Monday, May 12, 2008

Yay!! Linen cupboard installed!!

Finally - I have a linen cupboard - you can see my mirror cabinet too. So nearly there.... I have also put down my deposit for my kitchen today - about an 11 week wait - so about late July I should be cooking with gas!


........

Thursday, May 8, 2008

Getting closer....

Since my last entry, I can home yesterday to find my mirror cabinet installed and today the shower screen door!! Never have I be happier to see a pane of glass. Hopefully linen cupboard tomorrow

Saturday, May 3, 2008

Bathroom nearly finished.... I can shower again!!!

I now have a 80% completed bathroom that is starting to look great!! Still no linen cupboard, shower screen door, mirror cabinet or paint - BUT I have running water and a power point!!! Exciting stuff. No more showers at work or the gym!!! Yay!!!

Saturday, April 19, 2008

Bathroom update after week 1

So far the bathroom has been stripped - so showers at the gym for me....







Friday, April 11, 2008

Lucy's cat door blocked off!!!




Before


My bathroom has been started today.... Lucy, my cat used to be able to get in and out of the house through a space between the wall and floor... Not anymore!!! Today, the toilet and basin have been removed and the new corner shower cavity has had the first layer of waterproofing. They were kind enough not to remove the old shower, so I would have something over the weekend. They have also installed a new cavity sliding door, as the old door really intruded on the space (The bathroom is about 2.2m x 2.3m)




In the coming week or so, my bathroom will have...
  • new floor, ceiling and wall lining
  • new back to wall toilet - position is being moved to where old shower is
  • new louvre windows to replace existing casement windos
  • tiles to floors and walls to window height
  • new taps and rail shower
  • wall hung vanity basin with mirror wall cabinet
  • linen cupboard
  • downlighting
  • extractor fan