Saturday, April 19, 2008

Bathroom update after week 1

So far the bathroom has been stripped - so showers at the gym for me....







Friday, April 11, 2008

Lucy's cat door blocked off!!!




Before


My bathroom has been started today.... Lucy, my cat used to be able to get in and out of the house through a space between the wall and floor... Not anymore!!! Today, the toilet and basin have been removed and the new corner shower cavity has had the first layer of waterproofing. They were kind enough not to remove the old shower, so I would have something over the weekend. They have also installed a new cavity sliding door, as the old door really intruded on the space (The bathroom is about 2.2m x 2.3m)




In the coming week or so, my bathroom will have...
  • new floor, ceiling and wall lining
  • new back to wall toilet - position is being moved to where old shower is
  • new louvre windows to replace existing casement windos
  • tiles to floors and walls to window height
  • new taps and rail shower
  • wall hung vanity basin with mirror wall cabinet
  • linen cupboard
  • downlighting
  • extractor fan

New roof!!!


The new roof and gutters were finished two days ago....YAY!!! No more worrying about when it rains or the wind blows too much!!! The roof colour is Colourbond Dune and the gutters in Colourbond Woodland Grey.